Keystone Power Plant Map 2010

2007 The Power Plant temporarily closed the trail during construction. There was a reroute established for the UltraChallenge only. After the construction was complete in 2008 the trail reverted back to the old path except for some minor changes depicted on this map from the Power Plant/Gai Consultants