<?xml version="1.0" standalone="yes"?>
<gpx
  xmlns="http://www.topografix.com/GPX/1/0"
  version="1.0"
  creator="http://www.rachelcarsontrails.org">
 <bounds maxlat="40.57473" minlon="-79.8245" minlat="40.57473" maxlon="-79.8245"/>
 <wpt lat="40.57473" lon="-79.8245">
  <url>http://www.rachelcarsontrails.org/Members/sgmentzer/rct12md3</url>
  <urlname>Rachel Carson Trails Conservancy</urlname>
  <desc>Rachel Carson Trail Maintenance Day May 05, 2012 from 09:00 am to 02:00 pm: We will be doing trail repair around Lefever Hill. We will be rebuilding the trail through a
short section of woods, and along a hillside.

This project will involve slope grading, removing debris from the path, clearing downed
trees, and blazing. Bring water, snacks, gloves, mattock, etc.

We will meet in the driveway of Costa Contracting (the first driveway west of the railroad
tunnel on Lefever Hill Road).
</desc>
  <name>Lefever Hill</name>
 </wpt>
</gpx>
