<?xml version="1.0" standalone="yes"?>
<gpx
  xmlns="http://www.topografix.com/GPX/1/0"
  version="1.0"
  creator="http://www.rachelcarsontrails.org">
 <bounds maxlat="41 20.20" minlon="-79 13.40" minlat="41 20.20" maxlon="-79 13.40"/>
 <wpt lat="41 20.20" lon="-79 13.40">
  <url>http://www.rachelcarsontrails.org/Members/dbeard/baker-trail-maintenance-5</url>
  <urlname>Rachel Carson Trails Conservancy</urlname>
  <desc>Baker Trail Maintenance Aug 08, 2008 08:00 PM through Aug 10, 2008 04:00 PM: The third of four planned weekend maintenance events on the Baker Trail for 2008. This weekend
will concentrate on finding, clearing and marking the trail through the last wooded section
of the norther 1/3 of the Baker. With new construction in the area and a pending re-route, this
will be a fun weekend of working in the woods on a modes 3.5 miles of trail. Pack plenty of food and
water and prepare for an weekend of camping out with friends at the Ridge Campground and
figuring out how to get from point A to point B. If time permits, we will blaze road way on south
towards Corscia.
</desc>
  <name>Cook Forest (Ridge Campground)</name>
 </wpt>
</gpx>
