<?xml version="1.0" standalone="yes"?>
<gpx
  xmlns="http://www.topografix.com/GPX/1/0"
  version="1.0"
  creator="http://www.rachelcarsontrails.org">
 <bounds maxlat="41 20.20" minlon="-79 13.40" minlat="41 20.20" maxlon="-79 13.40"/>
 <wpt lat="41 20.20" lon="-79 13.40">
  <url>http://www.rachelcarsontrails.org/Members/dbeard/baker-trail-maintenance-4</url>
  <urlname>Rachel Carson Trails Conservancy</urlname>
  <desc>Baker Trail Maintenance Jul 11, 2008 07:00 PM through Jul 13, 2008 04:00 PM: The second of four planned weekend maintenance events on the Baker Trail for 2008. This
weekend will concentrate on a scenic 14 mile of the Baker from the intersection of Frozen Toe
and McCutcheon roads north to the Cook Forest Fire Tower. The trail is in generally great shape
through here (except for .3 miles of heavily logged forest near Summerville Road) and an early
scouting party reports that simple loping and blazing should be sufficient. So, pack plenty
of food and water and prepare for an easy weekend of camping out with friends at the Ridge
Campground and just enjoying the beautiful woods with clippers and paint brush in hand. We
plan to have a special all chainsaw maintenace just to focus on the problem area later in the
summer.
</desc>
  <name>Cook Forest (Ridge Campground)</name>
 </wpt>
</gpx>
